Quantcast
Channel: Projects
Browsing latest articles
Browse All 7 View Live

Image may be NSFW.
Clik here to view.

Fabrication of spacers, trunking & ducting modifications

  Fabrication of carbon steel spacers, trunking & ducting modifications: The following jobs were completed on board the vessel during Dry Dock. 1.Shut off dampers replacement and repairs. In...

View Article


Image may be NSFW.
Clik here to view.

Ducting, fabrication & installation

  Replacement of ducting, fabrication of doors and panels, bellow replacement The work that was performed on the vessel during dry dock was the following: 1.Replacement of 96 sections of galvanized...

View Article


Image may be NSFW.
Clik here to view.

Supply & installation of A/C units, trunking replacement, floor repair

  Supply & installation of A/C units, trunking replacement, floor repair Performed the following work on board the vesselduring dry docking: 1.Replacement of Main Galley trunks   Before After...

View Article

Piping modification, duct renewal & metal work

  Piping modification, duct renewal & metal work All the work that was done during the dry docking of a vessel is listed below: 1.Installation of 39 Heat recovery wheels with all their components:...

View Article

Heat recovery wheels replacement

  Heat Recovery Wheels replacement Work performed on board a vessel during dry dock: 1.Demolition and removal of the old Heat Recovery Wheels. 2.Cleaning of the work area, from the trash, in the ACS...

View Article


Image may be NSFW.
Clik here to view.

Metal work (trunk & ceiling renewal)

  Trunk & Ceiling Renewal The work during the dry docking of a vessel is listed below: 1.Trunking renewal, in detail: *Procurement of required material 3/16’’ carbon steel *Blasting and painting of...

View Article

Image may be NSFW.
Clik here to view.

Insulation renewal, ball bearings on elecrtic motors replacement and opening...

  Insulation renewal, ball bearings on elecrtic motors replacement and opening of two access doors The work that was performed during dry dock was: 1.Replacement of existing hot water insulation   Pipe...

View Article
Browsing latest articles
Browse All 7 View Live