Insulation renewal, ball bearings on elecrtic motors replacement and opening of two access doors
The work that was performed during dry dock was:
1.Replacement of existing hot water insulation
Clik here to view.

Clik here to view.

Clik here to view.

Clik here to view.

2.Fabrication and installation of two inspection hatches for the cold water pipe in main galley
Clik here to view.

Clik here to view.

Clik here to view.

Clik here to view.

Inspection Hatches
3.Insulation renewal on chilled water lines
Clik here to view.

Clik here to view.

Clik here to view.

Clik here to view.

4.Ball bearings on main ER ventilation fans electric motors replacement
Clik here to view.

5.Fan bracket and motor bases of AHU replacement
Clik here to view.

Clik here to view.

Clik here to view.

Clik here to view.

Additional jobs that were requested during dry dock
1.Opening of two access doors/hatches
2.Ceiling reinforcement